Topic wise notes as per new NCHM-JNU syllabus (for B.Sc HHA & M.Sc HA) are are now available at our new website hospitality.institute
Select Page

Methods of conserving energy in different area of operation of a hotel

by

How to conserve energy in key discipline areas of a hotel

 

Energy conservation is a team job, and the contribution of every single staff makes a difference. Therefore, it is important that all employees be appropriately counseled and appraised of small habits that go a long way in conserving energy. Some useful tips on power saving for some energy consuming majors in the industry are enlisted as under:

 

F & B department

 

  • Switch on only that equipment which is required.
  • Prepare a schedule clearly indicating additional equipment requirement during peak season.
  • Check the capacity of heavy equipment, like ovens, deep fat fryers, dough kneaders etc. and plan for optimum capacity utilizations.
  • Time required for preheating the oven should be known and notified to all staff concerned.
  • Oven doors not to be opened for longer than necessary for loading and unloading. Opening doors frequently reduces efficiency and results in energy loss.
  • Switch off ovens, and gas ranges that are not necessary / not in use.
  • Limit the general use of hot water to 1060 F.
  • Cook on the largest volume possible.
  • Turn down heat as soon as food begins to boil.
  • Keep all cooking surfaces clean.
  • Bring the frosted meat/vegetables/fruit items to room temperature before you start cooking.
  • Soaking of lentils and rice helps in energy conservation.
  • Place foil under range and griddle burners.
  • Do not turn on the gas burners until you are ready to cook.
  •  Timers should be installed on the kitchen equipment.
  • Burners should always be at minimum before placing the pot or kettle on them.
  • Use flat-bottom pans and pots to maximize heat transfer.
  • Regularly check all gas units for uneven or yellow flames.
  • Replace the outdated equipment with more energy efficient ones.
  • Follow scheduled maintenance of equipment.
  • Check proper insulation and earthing of equipment on a routine basis.
  • Proper cleaning and maintenance of equipment reduce fuel consumption.
  • Install chandeliers and other decorative light fixtures in restaurants, coffee shops, banquets, nightclubs, discotheques etc.
  • Banquet is a major section of energy consumption. So, control the functioning of a/c according to the time of function; e.g. if function starts at 15-00 hrs, then switch on the AC system at 14-30 hrs and if it schedules closing at 21-00 hrs, then switch off the AC system at 20-30 hrs.
  • Timely defrosting in case of refrigerated equipment helps in energy conservation.
  • Replace incandescent bulbs with CFL lamps.

 

Room Division

 

  • Make use of natural light when designing the rooms. A saving of half an hour per day results in energy conservation of almost 180 hrs per room per year.
  • Use light finishes for walls and ceilings for better reflection.
  • Reduce wattage of lamps with the help of light savers.
  • Switch off light in corridors bearing in mind safety and security.
  • Switch off TV or music in an unused room.
  • Keep draperies closed in guest rooms.
  • Ensure that leakage in water taps is promptly attended.
  • Laundry is a major section of energy consumption in the housekeeping dept., so develop a regular preventive maintenance and cleaning program of the heavy-duty equipment.
  • Control neon fixtures, other floodlights and spot fixtures used for illuminating building exterior on present automatic time switches.
  • Place alternate lights in passages, corridors, staircases, backyards, and compounds on separate circuits.
  • Practice preventive maintenance.
  • Turn off all the lights of all the public areas when not required.
  • Turn off the corridor lights during the day when natural light is adequate.
  • Install master switch controls in all lights of the guest rooms and which can be synchronized with looking arrangements from outside the entrance door to turn off and turn on the supply of electricity.
  • Follow manufacturer’s instructions for maximum output of equipment.

 

Engineering

 

  • Do not deploy reheating for comfort applications; under perfect conditions reheating units are not desirable.
  • Check the quality of water and provide necessary water treatment solution to prevent scaling and fouling of heat exchangers.
  • Switch off HVAC equipment in unoccupied areas paying attention to the humidity condition.
  • Ensure that the heat exchangers, cooling towers, cooling coils are thoroughly cleaned and maintained periodically.
  • Check air-handling unit for air quantities.
  • Check ventilation and exhaust systems and limit the number of air changes to the minimum that is acceptable.
  • Implement regular cleaning programmes for HVAC system filters.
  • All electrical distribution system should be checked and all the phases are to be balanced.
  • Implement an effective preventive maintenance programme for the boiler house.
  • Hot water supply and return pipes should be adequately insulated to minimize heat loses.

How useful was this post?

5 star mean very useful & 1 star means not useful at all.

Average rating 4.2 / 5. Vote count: 13

No votes so far! Be the first to rate this post.

We are sorry that this post was not useful for you! 😔

Let us improve this post!

Tell us how we can improve this post?

Syllabus BHM306

01 Hotel Design

  1. Design Consideration
    1. Attractive Appearance
    2. Efficient Plan
    3. Good location
    4. Suitable material
    5. Good workmanship
    6. Sound financing
    7. Competent Management

02 Facilities Planning

  1. The systematic layout planning pattern (SLP)

Planning consideration

  1. Flow process & Flow diagram
  2. Procedure for determining space considering the guiding factors for guest room/ public facilities, support facilities & services, hotel administration, internal roads/budget hotel/5 star hotel

Architectural consideration

  1. Difference between carpet area plinth area and super built area, their relationships, reading of blue print (plumbing, electrical, AC, ventilation, FSI, FAR, public Areas)
  2. Approximate cost of construction estimation
  3. Approximate operating areas in budget type/5 star type hotel approximate other operating areas per guest room
  4. Approximate requirement and Estimation of water/electrical load gas, ventilation

03 Star Classification of Hotel

  1. Criteria for star classification of hotel (Five, four, three, two, one & heritage)

04 Kitchen

  1. Equipment requirement for commercial kitchen
    1. Heating – gas/electrical
    2. Cooling (for various catering establishment)
  2. Developing Specification for various Kitchen equipments
  3. Planning of various support services (pot wash, wet grinding, chef room, larder, store & other staff facilities)

05 Kitchen Layout & Design

  1. Principles of kitchen layout and design
  2. Areas of the various kitchens with recommended dimension
  3. Factors that affect kitchen design
  4. Placement of equipment
  5. Flow of work
  6. Space allocation
  7. Kitchen equipment, manufacturers and selection
  8. Layout of the commercial kitchen (types, drawing a layout of a Commercial kitchen)
  9. Budgeting for kitchen equipment

06 Kitchen Stewarding Layout and Design

  1. Importance of kitchen stewarding
  2. Kitchen stewarding department layout and design
  3. Equipment found in kitchen stewarding department

07 Stores – Layout and Design

  1. Stores layout and planning (dry, cold and bar)
  2. Various equipment of the stores
  3. Work flow in stores

08 Energy Conservation

  1. Necessity for energy conservation
  2. Methods of conserving energy in different area of operation of a hotel
  3. Developing and implementing energy conservation program for a hotel

09 Car Parking

  1. Calculation of car park area for different types of hotels

10 Planning for Physically Challenged

11 Project Management

  1. Introduction to Network analysis
  2. Basic rules and procedure for network analysis
  3. C.P.M. and PERT
  4. Comparison of CPM and PERT
  5. Classroom exercises
  6. Network crashing determining crash cost, normal cost