Topic wise notes as per new NCHM-JNU syllabus (for B.Sc HHA & M.Sc HA) are are now available at our new website hospitality.institute
Select Page

Kitchen stewarding department layout and design

by

Kitchen Stewarding Department Layout and Design

 

Layout of stewarding department

Kitchen stewarding department layout and design 1
stewarding layout

Here is a sample of a daily sanitation schedule for the kitchen area
After Each Use and at the End of the Day
The things and areas in the kitchen that need to be washed, rinsed, and sanitized after each use include:
1.    Preparation areas.
2.    Tilt skillet.
3.    Rotisserie skewers and the tines.  These also need to be degreased at the end of the day.
4.    Slicers and stand.
5.    Three-compartment sinks.
After Every Four Hours
There are also some areas in the kitchen as well as kitchen items that need to be washed, rinsed, and sanitized every four hours.  These are the:
1.    Counters, especially the prep area counters.  They should also be washed, rinsed, and sanitized in between products.
2.    In-use utensils.  Like the counters, they should also be washed, rinsed, and sanitized in between products.
3.    Scales.  They should also be washed, rinsed, and sanitized between each use.
4.    Hand sink handles.
5.    Ice carriers.
6.    In-use wiping cloths.  Be sure to place them in their appropriate linen bag before they are sent to the laundered.
7.    Knife holders.
Throughout Shift and as Needed
Some areas and kitchen equipments that need to be washed and wiped clean all throughout the shift and as needed include:
1.    Front doors.
2.    Pizza oven.
3.    Floors.
Before and After Each Shift
Each stewarding department shift should make it a point that all these areas are taken care of before and after each shift:
1.    Bathroom mirrors should be spotlessly clean.
2.    Bathroom should be restocked with hand soap as well as paper towels.
3.    Hand sink areas should be washed, rinsed, and sanitized.
At the End of the Shift
At the end of each shift, it is the stewarding department’s duty and responsibility to wash, rinse, and sanitize these areas:
1.    Front counters and shelves.
2.    Countertop coolers and shelves.
3.    Delivery counters.
4.    Hood filters.  They should also be degreased and air dried.
At the End of the Day
Before closing the restaurant, here are the areas in the kitchen and kitchen items that the stewarding department needs to address:
1.    Bathroom equipments and surfaces, including the bathroom floor and tiles as well as bathroom mirrors.
2.    Condiment containers need to be washed, rinsed, and sanitized.
3.    Cooling racks.
4.    Dish racks.
5.    Drain covers.
6.    Freezers.
7.    Ice-cream dipper well.
8.    Line drawers.
9.    Line inserts.
10.    Mixer base and exterior.
11.    Pizza oven.
12.    Pizza oven tiles.
13.    Product storage containers and bins.
14.    Reach-in handles.
15.    Reach-ins and wells.
16.    Rotisserie, its holding drawers, and its exteriors.
17.    Walk-in freezers and chillers.
18.    Dry storage areas.
19.    Mops and brushes.  These should be washed, rinsed, sanitized, and hung upside down so as to allow the excess liquid to drip down and for the mops and brushes to dry.
20.    Trash receptacles.
21.    Exterior premises of the restaurant.

How useful was this post?

5 star mean very useful & 1 star means not useful at all.

Average rating 4.3 / 5. Vote count: 11

No votes so far! Be the first to rate this post.

We are sorry that this post was not useful for you! 😔

Let us improve this post!

Tell us how we can improve this post?

Syllabus BHM306

01 Hotel Design

  1. Design Consideration
    1. Attractive Appearance
    2. Efficient Plan
    3. Good location
    4. Suitable material
    5. Good workmanship
    6. Sound financing
    7. Competent Management

02 Facilities Planning

  1. The systematic layout planning pattern (SLP)

Planning consideration

  1. Flow process & Flow diagram
  2. Procedure for determining space considering the guiding factors for guest room/ public facilities, support facilities & services, hotel administration, internal roads/budget hotel/5 star hotel

Architectural consideration

  1. Difference between carpet area plinth area and super built area, their relationships, reading of blue print (plumbing, electrical, AC, ventilation, FSI, FAR, public Areas)
  2. Approximate cost of construction estimation
  3. Approximate operating areas in budget type/5 star type hotel approximate other operating areas per guest room
  4. Approximate requirement and Estimation of water/electrical load gas, ventilation

03 Star Classification of Hotel

  1. Criteria for star classification of hotel (Five, four, three, two, one & heritage)

04 Kitchen

  1. Equipment requirement for commercial kitchen
    1. Heating – gas/electrical
    2. Cooling (for various catering establishment)
  2. Developing Specification for various Kitchen equipments
  3. Planning of various support services (pot wash, wet grinding, chef room, larder, store & other staff facilities)

05 Kitchen Layout & Design

  1. Principles of kitchen layout and design
  2. Areas of the various kitchens with recommended dimension
  3. Factors that affect kitchen design
  4. Placement of equipment
  5. Flow of work
  6. Space allocation
  7. Kitchen equipment, manufacturers and selection
  8. Layout of the commercial kitchen (types, drawing a layout of a Commercial kitchen)
  9. Budgeting for kitchen equipment

06 Kitchen Stewarding Layout and Design

  1. Importance of kitchen stewarding
  2. Kitchen stewarding department layout and design
  3. Equipment found in kitchen stewarding department

07 Stores – Layout and Design

  1. Stores layout and planning (dry, cold and bar)
  2. Various equipment of the stores
  3. Work flow in stores

08 Energy Conservation

  1. Necessity for energy conservation
  2. Methods of conserving energy in different area of operation of a hotel
  3. Developing and implementing energy conservation program for a hotel

09 Car Parking

  1. Calculation of car park area for different types of hotels

10 Planning for Physically Challenged

11 Project Management

  1. Introduction to Network analysis
  2. Basic rules and procedure for network analysis
  3. C.P.M. and PERT
  4. Comparison of CPM and PERT
  5. Classroom exercises
  6. Network crashing determining crash cost, normal cost