Topic wise notes as per new NCHM-JNU syllabus (for B.Sc HHA & M.Sc HA) are are now available at our new website hospitality.institute
Select Page

Material Planning and Control – Techniques of material Planning

by

Meaning of Materials Planning:

Materials Planning has been defined as the scientific way of determining the requirements of raw materials, components and other items needed for production within the economic investment policies. It is rather a subsystem in the overall planning activity. There are many factors, which influence the activity of material planning. These factors can be classified as macro and microsystems.

  1. Macro factors: Some of the micro factors which affect material planning are price trends, business cycles Govt. import policy, etc.
  2. Micro factors: Some of the micro factors that affect material planning are plant capacity utilization, rejection rates, lead times, inventory levels, working capital, the delegation of powers and communication.

Techniques of Materials Planning:

The techniques of materials planning are:

(a) Bill of Materials Explosion and

(b) Past Consumption Analysis.

(a) Bills of materials explosion:

The planning for materials management is aimed at determining the demand for the end-products. This is possible only through farsightedness or forecasting. Therefore, forecasting forms “the basis for materials planning. There are various techniques for forecasting. These techniques are equally applicable to demand to forecast.

The techniques are:

(i) Moving averages method.

(ii) Exponential smoothing and Time series.

After the demand forecast, the exercise of materials planning starts. Requirements for various materials are ascertained from the demand forecast. For this purpose, the bill of materials is used through explosion charts. Here the use of computers is very effective for the “exploding” bill of materials with demand forecasts. The bill of materials is prepared and issued by the planning or engineering department in a standard form.

An explosion chart is just a series of bills of materials grouped together in a matrix form so that combining the requirements for different components can be done. Materials planning are usually made for a short period on a quarterly basis and at the beginning of every quarter; it is quite natural to find that some materials are in short supply and some in excess. This can be ascribed to the wrong forecasting.

To rectify such errors in the estimation of materials, quarterly planning is resorted to. In engineering industries, even quarterly planning seems to be too long and realistic order is placed with the suppliers.

Techniques of Material Planning

 

(b) Past Consumption Analysis:

For continuously needed materials and the materials where no bill of materials is possible, this technique of analysis is adopted- The past consumption data is analyzed and a projection for the future on the basis of past experience and future need is made. To prepare such a projection, “average” or “mean” consumption and the “standard deviation” are taken as bases and as guidelines for each item.

These are all statistical tools and are very effective to absorb the stock of fluctuation in consumption of direct and indirect materials where no straight-forward norms of consumption can be formulated. In the process industries, this technique is particularly suitable.

 

 

How useful was this post?

5 star mean very useful & 1 star means not useful at all.

Average rating 4 / 5. Vote count: 15

No votes so far! Be the first to rate this post.

We are sorry that this post was not useful for you! 😔

Let us improve this post!

Tell us how we can improve this post?

Syllabus – Equipment & Material Management

1. Material Handling

  1. Introduction and Meaning
  2. Objectives of Material Handling
  3. Principles of Material Handling
  4. Selection of Material Handling Equipments
  5. Evaluation of Material Handling System
  6. Guidelines For Effective Utilisation of Material Handling Equipments
  7. Relationship between operational layout and Material Handling Equipments

2. Material Management

  1. Introduction and Meaning
  2. Functions of Material Management
  3. Material Planning and Control
    1. Techniques of material Planning
  4. Purchasing
    1. Practical Purchasing Skills – theory, practice and techniques
    2. Strategic Procurement Skills
    3. Supplier Relationships: The Total Management Process
  5. Logistic Management
    1. Logistic Analyst
    2. Store Management
    3. Advanced Materials Storage Management Policy and Process
    4. Identifying and Implementing Business Process Improvements
  6. Inventory Control
    1. Integrated Inventory Management
    2. Managing Risk
    3. How to Reduce Inventory Levels – Some Practical Solutions
  7. Standardisation, Codification and Variety Reduction
  8. Value Analysis
  9. Ergonomics
  10. Just In Time (JIT) – Seven Wastes & Benefits of JIT

3. Work Study

  1. Advantages of Work study
  2. Method study
  3. Motion Study
  4. Work Measurement
  5. Time study

4. Quality Control

  1. Introduction
  2. Fundamental Factors Affecting Quality
  3. Need for controlling quality
  4. Types of Inspection
  5. Types of quality Control
  6. Steps in quality Control
  7. Tools for quality control

5. Maintenance Management

  1. Objectives of Maintenance
  2. Types of Maintenance (Break Down, Preventive & Predictive)
  3. Maintenance Planning & Scheduling
  4. Repair, Upkeep and Maintenance
  5. Best Maintenance Practices
  6. Computer Aided Maintenance

6. Waste Management

  1. Introduction and Meaning
  2. Reasons for generation and accumulation-obsolete and surplus
  3. Taxonomy of Waste
  4. Waste and Productivity o Functional
  5. Classification of Waste
  6. Control of Waste
  7. Recycling of Waste
  8. Disposal of Waste
  9. Treatment of Waste in Cost Accounts

7. Packaging and Distribution Management

  1. Packaging
  2. Transport
  3. Physical Distribution
  4. Information And Technology Integration in Materials Management